Elizabeth Castle
Marine Construction
Elizabeth Castle
Geomarine successfully tendered for the repair works on Elizabeth Castle L’Hermitage Breakwater. The works involved surveying the Western face of the L’Hermitage breakwater, breakout of identified areas to the required depth, install stainless steel reinforcement with the hand place of a cementitious Parex aquatic mortar with Hatcrete colour additive to provide a surface finish to match the existing granite face.