38 piles were installed using Grundomat bottom driven piles which was more suited to the foreshore conditions. Once the steel casings were driven in using a pneumatic hammers, the casings were filled with a high strength cement grout and reinforced to offer longevity of a marine grade concrete pile system. Transition from the Grundomat pile system to an aesthetically pleasing marine hardwood slip structure was done by installing a bespoke steel bracket system, grouted into the pile head. The bracket arrangement was designed with a galvanised finish and incorporating some sacrificial thickness in the steel parts to provide a lifetimes resistance to corrosion in the saltwater environment.