Old Boys’ Grammar School Redevelopment, Guernsey

Included within the contract was the excavation, piling and substructure works associated with 5 separate accommodation blocks. Within these blocks 16 split level slabs will provide a footprint in excess of 1400m² for the end user, Guernsey Housing Association. Tight tolerances are required due to the future installation of the prefabricated SIPS system specified by CAD.